Forensic Engineer, Eugene

Pillar Consulting Group offers comprehensive forensic engineering to clients in Eugene, Oregon.

Pillar Consulting Group’s engineers have the expertise to investigate and evaluate causes for and solutions to structural failure and degradation.  Structural failures may be anything from excessive deflection to a sudden catastrophic collapse.  Degradation may be due to corrosion in steel elements, deterioration of concrete elements or rot in wood elements.  This may be caused by natural or man-made environmental factors such as wind loading, snow loading or chemical reaction; or may be caused by impact or other overloading.

Pillar Consulting Group is well versed in building code requirements for structural repairs, additions and alterations to buildings.  We have extensive experience in concrete repair methods for both deteriorated concrete and corroded rebar, strengthening of existing steel and wood, and evaluation and repair of steel storage tanks.

Our team is located in Corvallis, Oregon and Condon, Oregon.
Certified engineering consultants
Serving a variety of industries
Proven track record of client success

Give us a Call!

(541) 993-2840

Get your project moving from concept to completion.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Recent Projects

Metals Finishing Facility

Pillar was directly responsible for building code analysis, building site layout, structural engineering and civil engineering for this metals finishing facility.


Chem Mill Facility

Pillar was directly responsible for building code analysis, building site layout, structural engineering and civil engineering for this titanium investment casting facility.


Western Warehouse

With over 135,000 square feet of area, this 600 foot long warehouse building required a building expansion joint to deal with the thermal effects of such a large structure. Multiple loading docks, wide bay spacing and energy efficient design elements create a highly efficient storage and distribution facility.


Hazardous Use Industrial Building

A severely corrosive atmosphere made precast concrete construction the optimum choice for this high-bay building, which also houses a 10-ton overhead bridge crane. Tight building pad area constraints were overcome through the use of a retaining wall under one wall of the building.


Pace American Facility

Pillar Consulting Group was the prime professional for this 40,000 square foot trailer manufacturing facility. The building includes 4000 square feet of office space and a large paint booth, which required careful building and fire code studies to ensure compliance and acceptance of the local Fire Marshall.